I went to see how the Spring Street bridge replacement is going. This bridge is being replaced so that the Purple Line light rail can go under Spring St.
![]() |
Where the bridge was (Feb 2025) |
All that is left of the old bridge is a few concrete columns sticking up into the air. On the right, you can see new columns being built that wil support the future bridge. This is on the east side of the bridge, the railroad tracks are closest to the camera and the metro tracks are on the other side.
![]() |
The bridge in August 2024 |
This is how things looked last August. Frankly, it doesn't look too different. Those same 3 columns are poking up between the metro tracks and the train tracks. On the far side you can see there is a full row of supports that have since been removed. This photo was taken from the west side, so here the metro tracks are closest to the camera and the railroad tracks are on the other side.
![]() |
The approach to the bridge (February 2025) |
![]() |
The approach to the bridge (August 2024) |
Here is the same section of Spring Street last August. Notice the difference? The crane visible in the distance is on the far side of the bridge and there is nothing staged in the road.
![]() |
A wider shot |
Here's another shot of the bridge construction. A metro train happened to come along right as I was taking the photo.